Austrian Tunnel Competence Center

Programme

07:30 - 08:30Registration
08:30 - 08:45Opening
 
Section 1BIM project experience
08:45 - 09:05Use of BIM for the optimized operation of road tunnels – Modelling approach, information requirements and exemplary implementationG. Vollmann et al.
09:05 - 09:25Use of BIM Technology for Optimization and Virtual Build of Bored TunnelsE. Dalton et al.
09:25 - 09:45Norwegian tunnel excavation – increasing digitalization in all operationsJ. Ka Yi Chiu, T. F. Hansen
09:45 - 10:05New built and refurbished railway tunnels: Data delivery from BIM Models to OEBB´s asset managementK. Großauer et al.
10:05 - 10:25Dynamic evaluation of the top-down construction of the Belfiore High-Speed railway StationL. Magursi
 
10:25 - 11:00Coffee break
 
Section 2VR Big Data ML AI
11:00 - 11:20Demands on digital data capturing of TBM and conventional tunnel drivesW. Fentzloff et al.
11:20 - 11:40Potential Applications of Machine Learning for BIM in TunnelingG. H. Erharter et al.
11:40 - 12:00Measurement While Drilling for face-decisions in Norwegian tunnelling – now powered by machine learningT. F. Hansen et al.
12:00 - 12:20Virtual Reality Simulator for Pipe Umbrella Installation WorksW. Dolsak
 
12:20 - 13:20Lunch break
 
Section 3BIM R&D
13:20 - 13:40The Tunneling Information Management SystemM. Huymajer et al.
13:40 - 14:00Data Drops for Tunnel Information ModellingG. Paskaleva et al.
14:00 - 14:20Adaptive and parameterized 3D BIM model for the tender and the tunnel excavation phaseR. Wenighofer et al.
14:20 - 14:40Prerequisites for BIM-based Invoicing in NATM ProjectsL. Winker et al.
14:40 - 15:00Current developments of digital ground modelling in tunnelingH. Exenberger et al.
 
15:00 - 15:15Coffee break
 
Section 4Digital onsite documentation
15:15 - 15:35High-resolution real-time multi-purpose tunnel surface 3D renderingG. Paar et al.
15:35 - 15:55Automation and digitalisation of the geological documentation in tunneling - from data acquisition to managementS. Rabensteiner et al.
15:55 - 16:15RApid Data Integration and Visualization (RADIV) in Complex Subterranean/Subsurface OperationsP. Hofer et al.
16:15 - 16:35Meshed laser scanner point cloud of the "Zentrum am Berg" research tunnel within one dayN. Studnicka, P. Dorninger
 
16:35 - 16:45Closing words